THE
GENESIS
PROJECT

Genesis will occupy a 10x10 land in Myland.
The project will consist of 3 towers with a total
of 10.000 units. The properties will be divided by
residential modules, stores, and commercial units.
Each unit will be sold as an ERC721A token NFT.
Mint date will be announced shortly.

Designed by FGMF
Developed by Mint Studios

Genesis is designed by FGMF, a real-life Brazilian
architecture firm founded in 1999 by Fernando Forte,
Lourenço Gimenes and Rodrigo Ferraz. FGMF has more
than 100 partners and is one of the biggest and most
prolific architecture firms in Latin America.

The technical development will be led by Mint Studios,
a 3D Visualization and Virtual
Interactive company based in Brazil.
With more than 20 partners Mint Studios
is well-positioned to bring Genesis to life.

Residences

Genesis Residence
Genesis Residence
Genesis Residence
Genesis Residence

Floor Plans

Genesis floor-plan
Genesis floor-plan
Genesis floor-plan
Genesis floor-plan
Genesis floor-plan
Genesis floor-plan
Genesis floor-plan

Life style

Genesis Residence

Roadmap

MINT
TOWER A

December 8th

REVEAL

Three days after sold out

Floorplans delivery

Renderings delivery

EXTERIOR 360 TOUR

One week after reveal

INTERIOR 360 TOUR

Two weeks after reveal

ALPHA PLAYABLE
METAVERSE - EXTERIOR

Four weeks after reveal

ALPHA PLAYABLE METAVERSE
INTERIOR LAYOUT
OPTION A*

Five weeks after reveal

ALPHA PLAYABLE METAVERSE
INTERIOR LAYOUT
OPTION B*

Eight weeks after reveal

ALPHA PLAYABLE METAVERSE
INTERIOR LAYOUT
OPTION C*

Eleven weeks after reveal

ALPHA PLAYABLE METAVERSE
INTERIOR LAYOUT
OPTION D*

Fourteen weeks after reveal

GAMIFICATION
MECHANICS + ARCADE GAMES

Eithteen weeks after reveal

VR COMPATIBILITY

Eighteen weeks after reveal

PAINTBALL BATTLE ROYALE

Twenty weeks after reveal

AUGMENTED REALITY

Twenty Four weeks after reveal

MARKETPLACE +
IN GAME CURRENCY

Twenty Four weeks after reveal

APARTMENTS ON SPECIFC
POSITION

Thirdy weeks after reveal

MOBILE VERSION

Fourty weeks after reveal

MORE TBA

*AT FIRST ALL APARTMENTS WILL BO DELIVERED IN A PROVISORY POSITION

Tower B and C supply will be announced after Tower A sold out.